Members are advised that an interim national deployment policy has been agreed to. This has been based on the Christchurch negotiated policy.

There is a larger document that is currently being held up at Rural level which should have addressed National and International deployments, it is because of this documents absence that we needed to get this document in place.

We will continue to drive Management to get the proper deployment policy completed ASAP.

Ian Wright
President
NZPFU

DOWNLOAD FILE DOWNLOAD FILE

Related Articles

VIEW ALL VIEW ALL

REMINDER: Annual General Meeting

With Auckland remaining at Level 3 in the Covid-19 lockdown, the Auckland Local has made the decision to conduct this year’s Annual General Meeting via zoom on Wednesday 3 November commencing at 10 a.m.


Annual General Meeting

With Auckland remaining at Level 3 in the Covid-19 lockdown, the Auckland Local has made the decision to conduct this year’s Annual General Meeting via zoom on Wednesday 3 November commencing at 10 a.m.


Breaking News

TFT 25mm GForce Hosereel Nozzle Recall

It has been brought to the Auckland Local’s attention that it has been discovered that the TFT 25mm Gforce hosereel nozzles are designed to a European specification, which is for low pressure nozzles, and have a maximum working pressure of 16 bar (1600 kPa) instead of the hose reel pressure version specified at 40 bar (4000 kPa).